首页> 外国专利> Preceding the construction method of the premises trench of nuclear power plant

Preceding the construction method of the premises trench of nuclear power plant

机译:核电站厂房trench的施工方法

摘要

PROBLEM TO BE SOLVED: To provide a pre-construction method for a premises-use trench of a nuclear power plant with which the trench can be constructed on earlier stage after a reactor building is constructed completely.SOLUTION: A pre-construction method for a premises-use trench of a nuclear power plant includes the steps of constructing a plurality of buildings for nuclear power generation, constructing the trench between the buildings via a gantry matching the trench to an installation level of the trench, and backfilling a gap between a foundation and the trench after the trench is constructed.
机译:解决的问题:为核电站的房屋用沟槽提供一种预制方法,该方法可在反应堆建筑物完全建成后的较早阶段建造该沟槽。核电厂的房屋用沟槽包括以下步骤:建造多个用于核发电的建筑物;通过将沟槽与沟槽的安装高度相匹配的龙门架在建筑物之间构建沟槽;以及回填基础之间的间隙以及建造完沟槽之后的沟槽。

著录项

  • 公开/公告号JP5677208B2

    专利类型

  • 公开/公告日2015-02-25

    原文格式PDF

  • 申请/专利权人 株式会社東芝;

    申请/专利号JP20110131516

  • 发明设计人 橋 本 裕;井 上 修;

    申请日2011-06-13

  • 分类号G21C13/00;

  • 国家 JP

  • 入库时间 2022-08-21 15:28:43

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号