Implementations generally relate to cost and profitability planning. In some implementations, a method includes constructing a graph data structure based on supply chain information and financial information. The method also includes computing cost information and profitability information based on the graph data structure. The method also includes generating a grid model from the cost information and the profitability information, where the grid model includes measures that are associated with dimension members arranged in hierarchies.
展开▼