首页> 外国专利> METHOD FOR OPERATING A COAL POWER PLANT AND A COAL POWER PLANT

METHOD FOR OPERATING A COAL POWER PLANT AND A COAL POWER PLANT

机译:煤电厂的运行方法及煤电厂

摘要

The invention relates to a method for operating a coal power plant (2) having a steam generator (4) and a turbo set (6), which comprises at least one steam turbine (8, 9, 10) and a generator (12), at a load demand of less than 50% of the maximum firing power (11) of the steam generator (4), characterized in that the supply of coal to coal burners of the steam generator (4) is interrupted and fuel gas (14) is supplied to a combustion chamber (16) of the steam generator (4) and is combusted, the fuel gas (14) being created from a pneumatic coal gasification process.
机译:本发明涉及一种用于运行具有蒸汽发生器(4)和涡轮机组(6)的燃煤电厂(2)的方法,该涡轮机组包括至少一个蒸汽涡轮机(8、9、10)和发电机(12)。在小于蒸汽发生器(4)最大燃烧功率(11)的50%的负载需求下,其特征在于,中断了向蒸汽发生器(4)的煤燃烧器的煤炭供应,并中断了燃气(14燃料气体(14)被供给到蒸汽发生器(4)的燃烧室(16)并被燃烧,其中燃料气体(14)是由气动煤气化过程产生的。

著录项

  • 公开/公告号WO2015117886A1

    专利类型

  • 公开/公告日2015-08-13

    原文格式PDF

  • 申请/专利权人 SIEMENS AKTIENGESELLSCHAFT;

    申请/专利号WO2015EP51808

  • 发明设计人 TREMEL ALEXANDER;LENK UWE;

    申请日2015-01-29

  • 分类号F22B31/04;F01K23/06;F01K7/06;F01K13/02;

  • 国家 WO

  • 入库时间 2022-08-21 15:04:57

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号