首页> 外国专利> ERECTION OF TUNNELS IN STRUCTURALLY UNSTABLE SOILS WITH KARST PHENOMENA AND/OR BOIL PROCESSES

ERECTION OF TUNNELS IN STRUCTURALLY UNSTABLE SOILS WITH KARST PHENOMENA AND/OR BOIL PROCESSES

机译:岩溶现象和/或沸腾过程在结构不稳定土壤中竖起隧道

摘要

FIELD: mining.;SUBSTANCE: proposed method comprises erection of forepoling along shotwall contour. Wells of the first type are drilled along contour of shotwall with said soils, injectors are fitted in every said well to inject solidifying mortar to well bed so that first contour of forepoling is produced from at least one layer of solidifying elements and compacted soil there between. Said first-type wells are arranged so that, at injection, intersecting zones of compacted soil are formed between adjacent wells. Solidifying elements hardened, second-type wells are drilled around forepoling first contour. Solidifying mortar is injected to well walls to make, over the forepoling height, a protective massif of one or several lines of elements intersecting in horizontal. Then, third-type wells are made with their bottoms to be arranged in imaginary cylindrical or elliptic surface above forepoling zone and thereunder. Hear, solidifying mortar in injected into plies of soil located under third-type well bottoms to produce cylindrical or elliptic roof above forepoling zone and thereunder composed by one or more lies of flat-parallel elements intersecting in horizontal to make a geological massif. Soil above said roof plies is additionally compacted by drilling fourth-type wells to inject there through said solidifying mortar into natural cavities and fractures formed in geological massif formation. Mortar can be composed of stock mix containing siliceous component, gas-forming agent, liquid sodium glass and sodium oxide hydrate solution, or simple sand-cement mortar. Said mortar is injected in resilient shells prefilled in said first- and third-type wells in soils with boil processes and second-type wells in extreme lines from forepoling.;EFFECT: forepoling over shotwall contour, higher reliability of soil massif.;6 cl, 4 dwg
机译:技术领域:提出的方法:所提出的方法包括沿炮墙轮廓竖立前推。第一类井沿着带有所述土壤的喷砂墙的轮廓钻孔,在每个所述井中安装喷射器,以将凝固砂浆注入井床,从而从至少一层凝固元素和其间的压实土壤产生前推的第一轮廓。布置所述第一类井,使得在注入时,在相邻井之间形成压实土壤的相交区域。围绕预先确定的第一轮廓钻出硬化的第二井固化元件。将凝固砂浆注入井壁,以在上述高度范围内形成与水平相交的一行或几行元素的保护性地块。然后,制造第三类型的井,其底部被布置在前推区域上方和下方的假想圆柱或椭圆形表面中。注入固化的砂浆,将其注入第三类井底下方的土壤层中,以在前推带上方形成圆柱形或椭圆形的屋顶,在其下方由一个或多个水平平行相交的平面平行元素组成的地质地块。通过钻第四类井进一步压实所述顶板层上方的土壤,以通过所述凝固砂浆将第四类井注入到天然空腔和地质地层形成中形成的裂缝中。砂浆可由包含硅质成分,气体形成剂,液态钠玻璃和水合氧化钠溶液的混合料或简单的砂水泥砂浆组成。所述砂浆被注入预先填充在具有沸腾过程的土壤的第一类和第三类井中的弹性壳中,而第二类井则被预先填充到极限线中;效果:在喷墙轮廓上进行前凸,土壤块体的可靠性更高; 6 cl 4 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号