首页> 外国专利> ARRANGEMENT METHOD OF CAPACITOR DEVICES IN 0,4 KV RURAL DISTRIBUTION NETWORKS

ARRANGEMENT METHOD OF CAPACITOR DEVICES IN 0,4 KV RURAL DISTRIBUTION NETWORKS

机译:0.4 KV农村配电网络中电容器装置的布置方法。

摘要

FIELD: electricity.;SUBSTANCE: method involves determination of values of lengths of the main line, two-phase and three-phase branches of the main line; measurement in assemblies corresponding to the obtained values of voltage and a power coefficient; with that, main line length value LM is determined according to a certain formula. After that, in the assembly corresponding to the obtained value LM there measured are total voltage losses relative to a transformer substation (TS) and a reactive power, if they do not meet maximum allowable values, a capacitor plant (CP) is installed in the assembly; and if actual total voltage losses and reactive power coefficient in this assembly meet maximum allowable values, and voltage losses and reactive power coefficient of domestic consumers do not meet maximum allowable values, length value is determined for two-phase and three-phase branches of main line L2-3. Then, total voltage losses relative to TS and reactive power coefficient are measured in the assembly corresponding to the obtained value, if the measured values do not meet maximum allowable values, CP is installed in this assembly; then, values of level of voltage and reactive power coefficient of domestic consumers are measured in a line; if measured values do not meet maximum allowable values, CP is installed in the branch line of the main line, which is the most distance from TS.;EFFECT: providing voltage of consumers at an allowable level, compensation of reactive power directly at its consumer and simplification of calculations of arrangement points of capacitor devices.;5 cl
机译:领域:电力。实质:该方法涉及确定干线,两相和三相支线的长度的值。根据获得的电压值和功率系数在组件中进行测量;这样,主线长度值L M 根据一定的公式确定。之后,在与获得的值L M 对应的组件中,测量的是相对于变电站(TS)和无功功率的总电压损耗,如果它们不满足最大允许值,则使用电容器组件中安装了工厂(CP);如果该组件中的实际总电压损耗和无功功率系数达到最大允许值,而家用用户的电压损耗和无功功率系数未达到最大允许值,则确定主电源的两相和三相分支的长度值L 2-3 行。然后,在与所获得的值相对应的组件中测量相对于TS的总电压损耗和无功功率系数,如果测量值不满足最大允许值,则在该组件中安装CP;然后,用一条线测量家用用户的电压水平值和无功功率系数值;如果测量值不符合最大允许值,则将CP安装在距TS最远的干线支线上。效果:提供负载的电压处于允许水平,直接在负载上补偿无功功率和简化电容器装置布置点的计算。; 5 cl

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号