首页>
外国专利>
TEMPORARY SCAFFOLD COST ESTIMATING SYSTEM, TEMPORARY SCAFFOLD COST ESTIMATING METHOD, AND TEMPORARY SCAFFOLD COST ESTIMATING PROGRAM
TEMPORARY SCAFFOLD COST ESTIMATING SYSTEM, TEMPORARY SCAFFOLD COST ESTIMATING METHOD, AND TEMPORARY SCAFFOLD COST ESTIMATING PROGRAM
展开▼
机译:临时棚架成本估算系统,临时棚架成本估算方法和临时棚架成本估算程序
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide a temporary scaffold cost estimating system, a temporary scaffold cost estimating method and a temporary scaffold cost estimating program by which a written cost estimate of a temporary scaffold needed in the construction or repair of a building can be easily prepared.;SOLUTION: A temporary scaffold cost estimating system is equipped with a memory 101 in which the name, the basic charge and the lease charge of each type of material for use in a temporary scaffold are stored in association with each other, an accepting unit 102 that accepts inputting of the number of days of leasing the temporary scaffold, an allocating unit 103 that acquires dimensional data of the building and allocates on the basis of the dimensional data the quantity of the materials to constitute the temporary scaffold to be arranged around the building, and a preparing unit 104 that references the memory 101 and prepares a cost estimate of the temporary scaffold on the basis of the number of days of leasing accepted by the accepting unit 102 and the quantity of the materials to constitute the temporary scaffold allocated by the allocating unit 103.;SELECTED DRAWING: Figure 2;COPYRIGHT: (C)2016,JPO&INPIT
展开▼