首页> 外国专利> METHOD OF LOCAL FILLING TO CONTROL SURFACE SUBSIDENCE IN GOB

METHOD OF LOCAL FILLING TO CONTROL SURFACE SUBSIDENCE IN GOB

机译:采空区局部沉降控制地面沉降的方法

摘要

A method of local filling to control surface subsidence in a gob. Metal nets are suspended at intervals from open-off cuts and on top plates behind a hydraulic bracket on a working surface along with coal cutting of a coal cutter and movement of the hydraulic bracket on the working surface, and filling bags are arranged; coal cutting is stopped after cutting is performed once by the coal cutter, and concrete is filled into the filling bags in the metal nets in sequence until a roof; cutting is continuously performed once by the coal cutter, metal nets are continuously suspended on top plates adjacent to the two sides of the filled area, filling is continuously performed to complete a filling cycle, and a row of filled bodies are formed in a gob parallel to the working surface; and coal cutting is continuously performed four to five times by the coal cutter, the following filling cycle is completed continuously, and the procedures are repeated until filling of the whole gob is completed and a plurality of rows of filled bodies are formed in the gob. The method is simple, and the filling cost is low. The top plates in the gob are supported uniformly at intervals; therefore, the stability of an overburden layer, in particular a key layer, can be improved, and surface subsidence and damage to buildings can be effectively prevented.
机译:一种通过局部填充来控制采空区地面沉降的方法。金属网从开孔口开始间隔悬挂,并在工作表面上的液压支架后面的顶板上悬挂,同时切煤机切煤并在工作表面上移动液压支架,并设置填充袋;用切煤机一次切煤后,停止切煤,将混凝土依次填充到金属网的填充袋中直至顶板。用切煤机连续进行一次切割,将金属网连续悬挂在靠近填充区域两侧的顶板上,连续进行填充以完成填充循环,并在料滴平行方向上形成一排填充体到工作表面;然后,由切煤机连续进行四到五次切煤,随后的填充循环连续完成,并重复上述过程,直到整个料滴填充完毕,并在料滴中形成多排填充体。该方法简单,填充成本低。料滴中的顶板均匀间隔支撑;因此,可以提高覆盖层,特别是关键层的稳定性,并且可以有效地防止地面沉降和建筑物损坏。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号