CONSTRUCTION LAYOUT OF COMBINED CAVERN GROUP OF UNDERGROUND NUCLEAR POWER PLANT IN DEPTH DIRECTION OF MOUNTAIN

机译:山区深部核电站地下室联合洞室施工图

摘要

Disclosed is a construction layout of a combined cavern group of an underground nuclear power plant in a depth direction of a mountain. The construction layout comprises a nuclear reactor workshop cavern (1), two combined caverns, two electric workshop caverns (2), two pressure relief caverns (7), a first main traffic hole (8), a second main traffic hole (9) and a third main traffic hole (10), wherein the three main traffic holes are in communication with the earth surface; the nuclear reactor workshop cavern (1), the combined caverns, the electric workshop caverns (2) and the pressure relief caverns (7) form a nuclear island workshop cavern group; crown arch feet or crown end walls of each cavern of the nuclear island workshop cavern group are in communication with the earth surface through a top-layer cavern support system; and side wall bottoms of each cavern of the nuclear island workshop cavern group are in communication with the three main traffic holes through a bottom-layer cavern support system. The construction layout has short mileage, high security, convenient construction, better investment saving and high degree of modularization, and can be widely applied to the technical field of nuclear power engineering.
机译:公开了地下核电站的组合洞穴群在山的深度方向上的构造布局。施工布局包括一个核反应堆车间洞穴(1),两个组合洞穴,两个电气车间洞穴(2),两个泄压洞穴(7),第一个主要交通孔(8),第二个主要交通孔(9)第三主通孔(10),其中,三个主通孔与地面连通。核反应堆车间洞穴(1),组合式洞穴,电力车间洞穴(2)和泄压洞穴(7)组成了核岛车间洞穴群;核岛车间洞穴群的每个洞穴的冠弓脚或冠端壁通过顶层洞穴支撑系统与地面连通。核岛车间洞穴群的每个洞穴的侧壁底部和底部通过一个地下洞穴支撑系统与三个主要交通孔连通。该建设方案里程短,安全性高,施工方便,节约投资,模块化程度高,可广泛应用于核电技术领域。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号