REPAIR METHOD OF DRIVING LANE WITH SWOLLEN ROAD BED OF MOUNTAIN TUNNEL OF EXPRESSWAY, AND SUSPENSION PIER USED THEREWITH
REPAIR METHOD OF DRIVING LANE WITH SWOLLEN ROAD BED OF MOUNTAIN TUNNEL OF EXPRESSWAY, AND SUSPENSION PIER USED THEREWITH
展开▼
机译:高速公路山地隧道花粉路基行车道修复方法及其所使用的悬架
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide a repair method and means for expanding an inner space of a mountain tunnel where automobiles drive, the inner space having contracted due to swelling of a roadbed in the tunnel.;SOLUTION: Pavement 2c is shredded beforehand at a location to be repaired. Main girders 9 on right and left are engaged to two ground anchors 5 on right and left, the main girders extending on a suspension material 6 suspended from a ceiling part 4a of lining concrete 4, and the ground anchors having been installed after securing one vehicle lane at a central part of the lining concrete 4. Lateral vibration is prevented by engaging a bottom edge of a diagonal-direction suspension material 6b with a suspension material engaging part 9b of the main girder 9, the diagonal-direction suspension material having been engaged to a lower edge 5b of the ground anchor 5 of the lining concrete 4 at obliquely upward right and left directions. A cross-beam 10 is installed on a lower flange 10b of the main girder 9 spanned in a tunnel direction. A lining plate 24 is installed on the cross-beam 10 for making a driving lane 2 of a suspension pier 7. A single-lane ramp 8 is connected to front and rear edge parts. A distal end of the ramp 8 is connected to the existing driving lane 2 and an invert is provided at a lower part of the suspension pier 7, thus repairing the driving lane of the tunnel.;SELECTED DRAWING: Figure 7;COPYRIGHT: (C)2017,JPO&INPIT
展开▼