首页> 外国专利> METHOD FOR ASSEMBLING WIND POWER GENERATOR, DECOMPOSITION METHOD FOR WIND POWER GENERATOR, INSTALLATION METHOD FOR WIND POWER GENERATOR, AND WORKING SHIP FOR WIND POWER GENERATOR

METHOD FOR ASSEMBLING WIND POWER GENERATOR, DECOMPOSITION METHOD FOR WIND POWER GENERATOR, INSTALLATION METHOD FOR WIND POWER GENERATOR, AND WORKING SHIP FOR WIND POWER GENERATOR

机译:风力发电机组的组装方法,风力发电机组的分解方法,风力发电机组的安装方法,风力发电机组的工作方式

摘要

PROBLEM TO BE SOLVED: To provide a method for assembling wind power generator capable of assembling the wind power generator within a short time while a nacell is placed in a horizontal orientation.SOLUTION: This invention relates to a method for assembling a wind power generator constituted by a wind power generator configured by assembling an upper structure 100B having a nacell 103 and a lower structure 100A having a floating member 101 to each other by using a working ship 1 having a frame 20. In this method, assembling step is carried out in such a manner that the upper structure is supported by the frame in such a way that a rotating shaft 103a of the nacell may become substantially in parallel with a horizontal surface W and also the lower structure is arranged below the upper structure, and at the same time a relative motion between the lower structure and the frame is restricted and the upper structure is moved downward with respect to the frame, and thus the lower structure and the upper structure are assembled to constitute the wind power generator.SELECTED DRAWING: Figure 16
机译:解决的问题:提供一种组装风力发电机的方法,该方法能够在短舱水平放置的同时短时间内组装风力发电机。解决方案:本发明涉及一种组装风力发电机的方法,该方法包括:通过使用具有框架20的作业船1将具有机舱103的上部结构100B和具有浮子101的下部结构100A彼此组装而成的风力发电机,在该方法中,进行组装工序。这样的方式使得上部结构由框架支撑,使得机舱的旋转轴103a可以变得与水平面W基本平行,并且下部结构也布置在上部结构的下方,并且当下部结构和框架之间的相对运动受到限制并且上部结构相对于框架向下移动时,下部结构a然后将上部结构组装成风力发电机。选图:图16

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号