CONSTRUCTION METHOD CRUSHED STONE PILE, CONSTRUCTION JIG OF CRUSHED STONE PILE AND CONSTRUCTION SYSTEM OF CRUSHED STONE PILE
CONSTRUCTION METHOD CRUSHED STONE PILE, CONSTRUCTION JIG OF CRUSHED STONE PILE AND CONSTRUCTION SYSTEM OF CRUSHED STONE PILE
展开▼
机译:碎石桩的施工方法,碎石桩的施工夹具及碎石桩的施工系统
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide a construction method of a crushed stone pile for preventing the inflow of sediment to the inside of a casing pipe, and capable of surely opening the tip of the casing pipe.;SOLUTION: A construction method of a crushed stone pile comprises a first process of penetrating a casing pipe 2 for providing a diametrical expansion part 5 on the tip into the ground in a state of separably storing a cover member 10 in the diametrical expansion part 5, a second process of pulling back the casing pipe 2 from underground and separating the cover member 10 from the diametrical expansion part 5, a third process of inputting a crushed stone G into the casing pipe 2 from aboveground and a fourth process of push-hardening the crushed stone G in the ground by repeating intrusion and pull-back of the casing pipe 2.;SELECTED DRAWING: Figure 2;COPYRIGHT: (C)2017,JPO&INPIT
展开▼