首页> 外国专利> Seismic Isolation Method for Seismic Performance Improvement of Structures with Seismic Isolators Base on Cutting Columns

Seismic Isolation Method for Seismic Performance Improvement of Structures with Seismic Isolators Base on Cutting Columns

机译:基于割柱的隔震改善结构隔震性能的隔震方法

摘要

The present invention relates to a seismic isolation method for a structure using a seismic isolation support installed in a cut column, which confirms a deformation rate and load generated in a column in each process step to promptly cope with a problem through a lifting jack and a flat jack when the problem occurs. According to the present invention, the seismic isolation method for a structure using a seismic isolation support installed in a cut column comprises: a deformation rate measurement gauge installation step (S1); a support reinforcement part installation step (S2); a lifting jack installation step (S4) of installing the lifting jack for lift between a support part and a reinforcement member; a column cutting step (S4) of cutting a part of a column between the support part and the reinforcement member; a flat jack installation step (S5) of installing the flat jack on the center of the upper surface of the cut column; a casing installation step (S6); a seismic installation support installation step (S7); a flat jack pressing step (S8) of pressing the flat jack (600) to correct a position; a filler injection step (S9) of injecting a filler into a casing; and a lifting jack disconnection step (S10) of disconnecting the lifting jack installed on the column after the filler (900) is cured. Accordingly, the lifting jack is disconnected, thereby completing the installation.
机译:本发明涉及一种用于结构的地震隔离方法,该方法使用安装在切割柱中的地震隔离支撑件,该方法确认了在每个处理步骤中在柱中产生的变形率和载荷,以通过起重千斤顶和起重机迅速解决问题。发生问题时使用扁平插孔。根据本发明,一种使用安装在割柱中的隔震支座的结构的隔震方法包括:变形率测量仪安装步骤(S1);以及支撑加强件安装步骤(S2);升降千斤顶安装步骤(S4),用于在支撑部分和加强构件之间安装用于提升的升降千斤顶;柱切割步骤(S4),其在支撑部分和加强构件之间切割一部分柱。扁平千斤顶安装步骤(S5),将扁平千斤顶安装在切割柱的上表面的中心;壳体安装步骤(S6);地震安装支架安装步骤(S7);压平插座(600)以校正位置的平插座压紧步骤(S8);填充剂注入步骤(S9),其将填充剂注入到壳体中;在填充物(900)固化后,将安装在柱上的起重千斤顶断开,然后进行起重千斤顶断开步骤(S10)。因此,解除起重千斤顶,从而完成安装。

著录项

  • 公开/公告号KR101884357B1

    专利类型

  • 公开/公告日2018-08-01

    原文格式PDF

  • 申请/专利权人 MACROAD CO. LTD.;LEE CHAE SUNG;

    申请/专利号KR20170174392

  • 发明设计人 LEE CHAE SUNG;

    申请日2017-12-18

  • 分类号E04H9/02;

  • 国家 KR

  • 入库时间 2022-08-21 12:37:21

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号