首页>
外国专利>
METHOD FOR OPERATION OF HYDROPOWER RESERVOIR WITH A 2-PARAMETER ELEVATION RULE CURVE
METHOD FOR OPERATION OF HYDROPOWER RESERVOIR WITH A 2-PARAMETER ELEVATION RULE CURVE
展开▼
机译:具有两参数高程曲线的水库水库运行方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
Disclosed herein is a novel method for operating a hydropower reservoir which is an improvement over the existing single-parameter (the current month) USACE Rule Curve approach, the improvement comprising the consideration of a second parameter, namely the water level of the reservoir at the beginning of the month, in the decision-making process for operation of the reservoir.
展开▼