首页>
外国专利>
DOMESTIC ENERGY GENERATION INSTALLATION AND OPERATING METHOD FOR OPERATING A DOMESTIC ENERGY GENERATION INSTALLATION
DOMESTIC ENERGY GENERATION INSTALLATION AND OPERATING METHOD FOR OPERATING A DOMESTIC ENERGY GENERATION INSTALLATION
展开▼
机译:进行本能发电安装的本能发电安装及操作方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
A method for operating a domestic energy generation installation comprises ascertaining or prespecifying at least one expectation time period, ascertaining an expected load profile of an electrical consumer, ascertaining an expected yield profile of the regenerative energy source in the expectation time period, ascertaining or prespecifying a minimum consumption power which should be available for withdrawal from the storage battery unit, ascertaining an energy balance over one expectation time period from the expected yield profile and the expected load profile, ascertaining a time range of the storage battery unit from the expected load profile, the expected yield profile and the minimum consumption power, which should not be undershot at any time, and from a currently ascertained state of charge of the storage battery unit, operating the fuel cell unit depending on the ascertained time range and operating the electrolysis unit depending on the ascertained energy balance.
展开▼