首页>
外国专利>
Smallcaliber composite pile wall using small drilling rig at adjacent building proximity section and construction method of the same
Smallcaliber composite pile wall using small drilling rig at adjacent building proximity section and construction method of the same
展开▼
机译:在邻近建筑物邻近段使用小型钻机的小口径复合桩墙及其施工方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
The present invention provides a small caliber composite pile wall for a section close to an adjacent building using small boring equipment and a construction method thereof, to form a wall, in which a composite pile capable of supporting soil pressure applied thereto is installed, in a section close to an adjacent building. According to a preferred embodiment of the present invention, the construction method comprises: a step (a) of using small boring equipment to perform boring operation in a position within a minimum separation distance of 30 cm from an adjacent building while maintaining a hollow wall by a steel pile; a step (b) of moving the boring equipment while remaining the steel pile and embedding a reinforcement material with a small specification in the steel pile; a step (c) of injecting mortar into the steel pile and curing the same to increase strength by a composite cross section so as to form a composite pile capable of bearing applied soil pressure; a step (d) of depositing cap concrete on the top of the composite pile, installing an intermediate pile, and performing rear water cutoff grouting on a rear surface side between the composite piles to prevent leachate from flowing in an excavation area; and a step (e) of performing underground excavation up to a target excavation depth step by step, and installing a wale and a support material in each step.
展开▼