首页> 外国专利> Method for stepwise construction of preferential gas migration pathway at stope in coal seam

Method for stepwise construction of preferential gas migration pathway at stope in coal seam

机译:煤层采场优先瓦斯迁移路径的逐步构建方法

摘要

A method for stepwise construction of a preferential gas migration pathway at a stope in a coal seam. First, a gas migration pathway is preliminarily formed at a stope depending on a mining effect of mining in a first mined seam. construction and stabilization method of gob-side entry retaining in deep strata, and a method of manual-guided pre-fracturing boreholes are then used to perform active construction respectively in external space and the outside of coal-rock mass to form preferential gas migration pathways. Eventually, under the effect of mining-induced stress, a system of preferential gas migration pathways connected to each other at the stope is further formed.
机译:一种用于在煤层的采场中逐步构造优先气体迁移路径的方法。首先,根据在第一开采层中开采的开采效果,在采场初步形成气体迁移路径。深层采空区侧入留存施工稳定方法,然后采用人工引导的预压裂孔法分别在煤岩体的外部空间和外部进行主动施工,形成优先的天然气运移通道。最终,在采矿引起的应力的作用下,进一步形成了在采场相互连接的优先气体迁移路径的系统。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号