Method for stepwise construction of preferential gas migration pathway at stope in coal seam
Method for stepwise construction of preferential gas migration pathway at stope in coal seam
展开▼
机译:煤层采场优先瓦斯迁移路径的逐步构建方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
A method for stepwise construction of a preferential gas migration pathway at a stope in a coal seam. First, a gas migration pathway is preliminarily formed at a stope depending on a mining effect of mining in a first mined seam. construction and stabilization method of gob-side entry retaining in deep strata, and a method of manual-guided pre-fracturing boreholes are then used to perform active construction respectively in external space and the outside of coal-rock mass to form preferential gas migration pathways. Eventually, under the effect of mining-induced stress, a system of preferential gas migration pathways connected to each other at the stope is further formed.