首页>
外国专利>
METHOD FOR PRE-STRESSING A STEEL STRUCTURE, AND STEEL STRUCTURE PRE-STRESSED USING SAID METHOD
METHOD FOR PRE-STRESSING A STEEL STRUCTURE, AND STEEL STRUCTURE PRE-STRESSED USING SAID METHOD
展开▼
机译:钢结构预应力的方法及采用sailed方法的钢结构预应力
展开▼
页面导航
摘要
著录项
相似文献
摘要
According to the method, at least one carbon fibre-reinforced polymer band is joined to the steel structure at the end regions thereof, capable of transferring tensile forces. Subsequently, at least one lifting element (7) disposed between the carbon fibre-reinforced polymer band (4) and the steel girder (3) to be reinforced in a region between these end anchorages (5), is extended substantially perpendicular to the carbon fibre-reinforced polymer band (4). So, a tensile force stress is generated between the end regions of the carbon fibre-reinforced polymer band (4). Then, a steel girder treated in such a manner includes at least one carbon fibre-reinforced polymer band, which is each joined to the steel structure (1) at the end regions thereof, capable of transferring tensile forces. In the region between these end regions, a lifting element (7) is disposed between the carbon fibre-reinforced polymer band (4) and the steel girder (3) to be reinforced, by means of which the carbon fibre-reinforced polymer band (4) is subjected to tensile stress by lifting away from the steel girder (3). The tensile force is transferred to the steel girder (3) via the anchoring elements (5).
展开▼