PRE-TENSIONING AND POST-ANCHORING CONSTRUCTION METHOD FOR PRESTRESSED ANTI-FLOATING ANCHOR ROD

机译:预应力抗浮锚杆的预紧及锚固后施工方法

摘要

The present invention relates to the technical field of prestressed anti-floating anchor rod construction. Disclosed is a pre-tensioning and post-anchoring construction method for a prestressed anti-floating anchor rod, characterized by comprising the following steps: 1) performing prestressed anchor rod construction; forming a drill hole in a soil body by construction, and lowering the prestressed anchor rod into the drill hole, and after lowering the prestressed anchor rod, pouring slurry into the drill hole; 2) the prestressed anchor rod comprising an anchor head and a rod body, the anchor head being located outside the drill hole, and the rod body being located in the drill hole; digging around an outer periphery of the anchor head to form a construction groove, and performing reinforced concrete construction in the construction groove to form an anchor pier; 3) performing tension locking on the prestressed anchor rod; and 4) constructing an underground structure above the soil body, and anchoring the anchor head into the underground structure. In this way, the prestressed anchor rod construction, the anchor pier construction, and the underground structure construction do not interfere with each other, facilitating construction management, facilitating tension locking, and simplifying construction steps; furthermore, a constraining force is generated for the underground structure to prevent the underground structure from floating upward, avoiding deformation of the underground structure due to upward floating, so that the anti-floating effect is enhanced.
机译:本发明涉及预应力抗浮锚杆结构技术领域。本发明公开了一种预应力防浮锚杆的预张锚固施工方法,其特征在于,包括以下步骤:1)进行预应力锚杆的施工。通过施工在土壤体上形成钻孔,将预应力锚杆降低到钻孔中,降低预应力锚杆后,将泥浆倒入钻孔中。 2)预应力锚杆,其包括锚头和杆体,所述锚头位于所述钻孔的外部,所述杆体位于所述钻孔中;围绕锚头的外围开挖,形成施工槽,并在施工槽中进行钢筋混凝土施工,形成锚墩。 3)对预应力锚杆进行拉力锁定; (4)在土体上方构造地下结构,并将锚头锚固在地下结构中。这样,预应力锚杆施工,锚墩施工和地下结构施工不会相互干扰,有利于施工管理,有利于张紧锁紧,简化了施工步骤。进一步的,对地下结构产生约束力,防止地下结构向上漂浮,避免了地下结构由于向上漂浮而变形,从而增强了防浮效果。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号