首页> 外国专利> METHOD OF FORCED TEMPERATURE REDUCTION OF PERMAFROST SOIL IN BASES OF PILE FOUNDATIONS OF OPERATED BRIDGE SUPPORTS

METHOD OF FORCED TEMPERATURE REDUCTION OF PERMAFROST SOIL IN BASES OF PILE FOUNDATIONS OF OPERATED BRIDGE SUPPORTS

机译:桥梁桥基桩基础中永久冻土的强制降温方法

摘要

FIELD: construction.;SUBSTANCE: invention relates to operation of permanent bridges on permafrost soils and can be used for permanent operated bridges with pile foundations, permafrost bases of which are used according to principle I. Method of forced lowering of permafrost soil temperature in bases of pile foundation foundations of operated bridge is performed with cold atmospheric air. Barrels of seasonal-action cooling devices (SCD) are blown by cold air from an air turbo-refrigerating machine after complete pumping of liquid coolant therefrom, which is again poured into boreholes of SCD after bases have reached calculated negative temperature values.;EFFECT: technical result consists in provision of forced lowering to design negative temperature values of permafrost soil in bases of pile foundation foundations of operated axle without changing structures of foundations and depth of piles immersion into thickness of permafrost soil of bases.;1 cl, 3 dwg
机译:用于永久性冻土的永久性桥梁技术领域本发明涉及在永久冻土上的永久性桥梁的操作,并且可用于具有桩基础的永久性操作的桥梁,该永久性桥梁根据原则I使用永久性冻土基础。桥梁的桩基基础施工是在大气冷的条件下进行的。季节性制冷装置(SCD)的桶在完全从中抽出液态冷却剂后,用空气涡轮制冷机中的冷空气吹出,然后在底座达到计算出的负温度值后再次倒入SCD的孔中;效果:技术成果是在不改变地基结构和桩深浸入基础永冻土厚度的情况下,通过强制降低设计工作轴桩基础中的多年冻土的负温度值。1cl,3 dwg

著录项

  • 公开/公告号RU2019105398A3

    专利类型

  • 公开/公告日2020-08-26

    原文格式PDF

  • 申请/专利权人

    申请/专利号RU20190105398

  • 发明设计人

    申请日0000-00-00

  • 分类号E02D3/115;

  • 国家 RU

  • 入库时间 2022-08-21 11:02:59

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号