首页> 外文OA文献 >Il PON Reti e Mobilità e gli obiettivi di Sostenibilità:udil ruolo del Piano di Monitoraggio Ambientale
【2h】

Il PON Reti e Mobilità e gli obiettivi di Sostenibilità:udil ruolo del Piano di Monitoraggio Ambientale

机译:pON网络和移动性与可持续性目标:a环境监测计划的作用

摘要

The National Operative Program (PON) “Reti e mobilità” has beenudapproved by European Commission on the 7th of December 2007.udThe strategic approach of the PON, exclusively devoted to the socalledud“convergence regions” of Italy (Campania, Calabria, Sicilia, Puglia),udaims to:ud1. improve the modal balance by an economic, social and environmentaludperspective;ud2. develop the inter-modality in order to move towards the integrationudof convergence area into the network of the European transportudsystem;ud3. improve the mobility and the accessibility, also to reduce the trafficudcongestion;ud4. increase the efficiency related to security standards, to managementudtechniques and to the quality of transportation services in the sectorudof freight;ud5. guarantee the reduction of environmental impacts through a globaludimprovement of the efficiency of the transport systems.udIn such a way it is clear that the PON “Reti e mobilità” takes greatly intoudaccount the Sustainability principles recognized at European scale asudattested by the budget, namely over the 70% of the entire fund,udassociated with low-impacts infrastructures (railways and harbors).udThe PON has been submitted to the SEA procedure, following what theud2001/42/CE Directive establishes.udThe Environmental Report of PON devotes great attention to theudmonitoring activity as shown by the reported recommendation aboutudthe need for adequate measures for the environmental monitoring, alsoudin order to apply corrective measures during the implementation of theudprogram. By this point of view, a first and important step has been theudelaboration of the “Environmental Monitoring Plan” (EMP) that representsudthe main methodological document for the following implementationudof the monitoring activity.udThis paper, after a brief presentation of the program and of the objectivesudof Sustainability that the Programs aims to pursue through the realizationudof specific projects, is devoted to introduce the EnvironmentaludMonitoring Plan of the PON that has been approved by the Ministry ofudthe Infrastructures and Transport -in charge as Management Authorityudof the PON- in February 2011. In detail, the PMA represents the tooludthrough which, the Management Authority, that has specificudresponsibilities and functions in terms of monitoring and environmentaludassessment of the program, controls the significant impacts on theudenvironment caused by the implementation of the PON and verify theudlevel of achievement of the established objectives of environmentaludsustainability. The structure of EMP is based on three main aspects:ud1) the adoption of the results of other interesting experiences carriedudout by experts institutions on the topic;ud2) an approach favoring the creation of an “integrated” monitoring systemudwith the others Operative Programs activated at regional scale;ud3) the implementation of a cooperation and shared process with all theuddirectly-involved actors.
机译:欧洲委员会已于2007年12月7日批准了国家行动计划(PON)的“退休能力”。 udPON的战略方法专门用于意大利所谓的“ ud”融合地区(坎帕尼亚,卡拉布里亚,西西里岛,普利亚大区), udaims为: ud1。通过经济,社会和环境的角度来改善模式平衡; ud2。发展多式联运,以便朝着融合 udof融合区域过渡到欧洲运输 udsystem网络; ud3。改善移动性和可访问性,同时减少通信量 ud拥塞; ud4。提高与安全标准,管理技术和部门运输质量 udud有关的效率; ud5。通过在全球范围内提高运输系统的效率来确保减少对环境的影响。 ud通过这种方式,很明显,PON“ Reti emobilità”极大地考虑了 uudad在欧洲范围内公认的 usadtested的可持续性原则。根据预算,即整个基金的70%,与低影响力的基础设施(铁路和港口)相关联。 ud按照ud2001 / 42 / CE指令的规定,PON已提交给SEA程序。 ud《 PON的环境报告》非常重视报告所建议的 u监测活动, u u u200b u200b u200b u200b u200b u200b u200b u200b需要对环境监测采取足够的措施,还应在实施ud计划期间采取纠正措施。从这一观点出发,第一步也是重要的一步是“环境监测计划”(EMP)的重新设计,该计划代表了以下实施监测活动的主要方法学文件 ud。计划的介绍以及计划的目标 udu可持续性,旨在通过实现特定项目实现 udd,专门介绍PON的环境 ud监测计划,该计划已由 ud基础设施和交通运输部批准-负责PON的管理机构 ud-于2011年2月。详细地,PMA代表工具 ud,其中,管理机构在程序的监视和环境评估方面具有特定的职责和功能,控制因实施PON而对环境产生的重大影响,并验证实现既定目标的水平环境可持续发展。 EMP的结构基于三个主要方面: ud1)采纳专家机构对该主题进行的其他有趣体验的结果 ud2)有利于创建“集成”监控系统的方法 udwith其他的行动计划则在区域范围内启动; ud3)与所有直接参与的参与者的合作和共享过程的实施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号