首页> 外文OA文献 >Comparison of two simulation methodologies in modeling construction systems : manufacturing-oriented PROMODEL vs. construction-oriented SDESA
【2h】

Comparison of two simulation methodologies in modeling construction systems : manufacturing-oriented PROMODEL vs. construction-oriented SDESA

机译:两种模拟方法在建模施工系统中的比较:面向制造的PROMODEL与面向施工的SDESA

摘要

To facilitate the practice improvement by use of simulation tools in construction, the present research generalizes the main characteristics that differentiate a construction system from a manufacturing system in light of simulation modeling. The PROMODEL simulation platform which is influential and popular in manufacturing is chosen for (1) validating the newly developed construction simulation platform called SDESA (the Simplified Discrete-Event Simulation Approach); and (2) identifying the differences between manufacturing and construction simulations by applying PROMODEL alongside SDESA to typical construction systems. In modeling a simple earth-moving operation and a real site operation integrating concreting and waste handling practices, the validity of SDESA is cross checked by the established PROMODEL and SDESA is found to be more flexible and straightforward in addressing construction systems in terms of (1) representing vehicle-loop work flows, (2) modeling resource transit times between various locations on site, (3) deriving resource utilization rates, and (4) learning efforts and application time requirements. The comparisons made can be taken as guidance for helping construction practitioners (1) to distinguish the modeling needs between construction and manufacturing simulations and (2) to select the suitable simulation tools for practice improvement.
机译:为了便于在建筑中使用仿真工具来改进实践,本研究总结了根据仿真建模将建筑系统与制造系统区分开的主要特征。选择在制造中具有影响力和流行的PROMODEL仿真平台来进行以下工作:(1)验证新开发的称为SDESA(简化离散事件仿真方法)的建筑仿真平台; (2)通过将PROMODEL和SDESA一起应用于典型的建筑系统,来识别制造和建筑模拟之间的差异。在对简单的土方作业和结合粪便和废物处理实践的实际工地进行建模时,已建立的PROMODEL对SDESA的有效性进行了交叉检查,发现SDESA在解决建筑系统方面具有以下方面的灵活性(1) )代表车辆环流工作流程,(2)建模站点各个位置之间的资源转换时间,(3)得出资源利用率,以及(4)学习努力和应用时间要求。所做的比较可以作为指导,以帮助建筑从业人员(1)区分建筑和制造仿真之间的建模需求,以及(2)选择合适的仿真工具以改进实践。

著录项

  • 作者

    Lu M; Wong LC;

  • 作者单位
  • 年度 2007
  • 总页数
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号