首页> 外文OA文献 >Equity issues in land acquisition: A source of delays in large construction projects in Vietnam
【2h】

Equity issues in land acquisition: A source of delays in large construction projects in Vietnam

机译:土地收购中的股权问题:越南大型建筑项目的延误根源

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Delays in construction projects are a recurring and global problem, with delays in land acquisition considered one of the largest contributors of delays in large construction projects in Vietnam. This research aims to investigate the formation of equity perceptions of land-acquired households and the relationship between equity issues and delays in construction projects. A theoretical model with four propositions, is proposed that links equity issues, comparisons, equity perceptions, and responses of land-acquired communities that cause delays in large construction projects in Vietnam. Using a case study approach, semi-structured interviews of 40 land-acquired households was conducted across two large construction projects in Vietnam. The findings of this research could provide better understanding of the relationship between equity issues and delays, which can help to minimise delays in large construction projects.
机译:建设项目的延误是一个反复出现的全球性问题,土地收购的延误被认为是越南大型建筑项目延误的最大原因之一。这项研究旨在调查对被征地家庭的公平观念的形成,以及公平问题和建设项目的延误之间的关系。提出了一个包含四个命题的理论模型,该模型将公平问题,比较,公平观念和土地获取社区的反应联系在一起,这些问题导致越南大型建筑项目的延误。使用案例研究的方法,在越南的两个大型建筑项目中对40个被征地家庭进行了半结构化访谈。这项研究的结果可以更好地理解股权问题与延迟之间的关系,从而有助于最大程度地减少大型建筑项目中的延迟。

著录项

  • 作者

    Vu, Thu Hang;

  • 作者单位
  • 年度 2017
  • 总页数
  • 原文格式 PDF
  • 正文语种
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号