Financial analysis of the change of construction tehnology used for viaduct Dobruša

机译:高架桥Dobruša施工技术变更的财务分析

摘要

The subject of the thesis is the cost analysis of the change in construction technology used for the viaduct Dobruša on the motorway section Vrba - Peračica. In the project for the tender, which was prepared by the investor, the viaduct Dobruša was designed as a continuous beam over five spans with a maximum of 72.5 m in length, constructed using balanced cantilever method. After the technology was changed, the viaduct was designed as a continuous beam over six spans with a maximum of 57.9 m in length, constructed using incremental launching. The thesis describes the contractor's procedure used to modify the technology of the construction according to the contract terms. Our objective is to present the results of the change in construction method, which had a positive impact on the deadline, the progress of the work and the price of the construction.
机译:本文的主题是对高速公路Vrba-Peračica上高架桥Dobruša使用的施工技术变更的成本分析。在由投资者准备的招标项目中,高架桥Dobruša被设计成五个跨段的连续梁,最大长度为72.5 m,采用平衡悬臂法构造。更改技术后,高架桥被设计为连续六段跨度最大为57.9 m的连续梁,采用增量发射法建造。本文描述了承包商根据合同条款修改施工技术的程序。我们的目标是介绍更改施工方法的结果,这些更改对截止日期,工作进度和施工价格产生了积极影响。

著录项

  • 作者

    Škapin David;

  • 作者单位
  • 年度 2012
  • 总页数
  • 原文格式 PDF
  • 正文语种 {"code":"sl","name":"Slovene","id":39}
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号