首页> 外文OA文献 >A statistical analysis of flood hydrology and bankfull discharge for the Daly River catchment, Northern Territory, Australia
【2h】

A statistical analysis of flood hydrology and bankfull discharge for the Daly River catchment, Northern Territory, Australia

机译:澳大利亚北领地戴利河流域的洪水水文和河滩流量的统计分析

摘要

Executive SummaryThis report presents a flood frequency analysis for ten gauging stations within the Daly River catchment. A flood frequency analysis allows the estimation of the magnitude of selected flood quantiles, such as a 1 in 20 year flood, at particular gauging stations. A series of statistical relationships were developed to allow flood quantile estimation at ungauged locations. Finally, estimates of bankfull discharge and its corresponding recurrence interval were obtained from gauging station cross section, direct stream gaugings and rating curve data. Bankfull discharge in the Daly River catchment has a recurrence interval from less than two to more than eight years on average at the stations examined here.
机译:内容提要本报告介绍了戴利河流域内十个计量站的洪水频率分析。洪水频率分析允许估计特定洪水位的选定洪水分位数,例如20年中的1年洪水。开发了一系列统计关系,以允许在未启用位置进行洪水分位数估算。最后,通过测量站横截面,直接流测量和额定曲线数据,获得了满溢流量及其对应的复发间隔的估算值。戴利河流域的河岸满溢流量在这里检查的站平均发生间隔不到两年到八年以上。

著录项

  • 作者

    Rustomji Paul;

  • 作者单位
  • 年度 2009
  • 总页数
  • 原文格式 PDF
  • 正文语种
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号