首页> 外文OA文献 >James Webb Space Telescope (JWST) Optical Telescope Element (OTE) Development Status
【2h】

James Webb Space Telescope (JWST) Optical Telescope Element (OTE) Development Status

机译:詹姆斯·韦伯太空望远镜(JWST)光学望远镜元件(OTE)的发展状况

摘要

The James Webb Space Telescope (JWST) Optical Telescope Element (OTE) is a segmented, cryogenic telescope scheduled for launch in 2011. In September of 2002, NASA selected prime contractor Northrop Grumman Space Technology (NGST) to build the observatory including management of the OTE. NGST is teamed with subcontractors Ball Aerospace, Alliant Techsystems (ATK). and Kodak. The team has completed several significant design, technology, architecture definition, and manufacturing milestones in the past year that are summarized in this paper.
机译:詹姆斯·韦伯太空望远镜(JWST)光学望远镜元件(OTE)是分段式低温望远镜,计划于2011年发射。2002年9月,美国宇航局选择了总承包商诺斯罗普·格鲁曼航天技术公司(NGST)建造了包括天文望远镜管理在内的天文台。 OTE。 NGST与分包商Ball Aerospace,Alliant Techsystems(ATK)合作。和柯达。该团队在过去的一年中完成了几个重要的设计,技术,体系结构定义和制造里程碑,这些都是本文总结的。

著录项

  • 作者

    Feinberg Lee D.;

  • 作者单位
  • 年度 2004
  • 总页数
  • 原文格式 PDF
  • 正文语种
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号