首页> 外文OA文献 >The Chilled Water and Hot Water Building Differential Pressure Setpoint Calculation - Chilled Water and Hot Water Pump Speed Control
【2h】

The Chilled Water and Hot Water Building Differential Pressure Setpoint Calculation - Chilled Water and Hot Water Pump Speed Control

机译:冷热水建筑差压设定值的计算-冷热水泵速度控制

摘要

More and more variable frequency devices (VFD)are being installed on the chilled water and hot waterpumps on the TAMU campus. Those pump speedsare varied to maintain chilled water or hot waterbuilding deferential pressure (DP) or returntemperature or flow rate at their setpoints. The chilledwater and hot water DP setpoint or returntemperature setpoint or flow rate setpoint was aconstant value or reset based on outside airtemperature. In some buildings, the chilled water andhot water DP setpoints were reset based on flow rate,but in many instances those setpoint schedules wereeither too low to maintain enough building DPrequirement or too high and consumed excess energy.The building DP reset schedule based on flow rate isstudied and compared with the other pump speedcontrol methods. Because the building DP setpointbased on flow rate method is achieved by tracking theload change, it saves energy than the other methods.In this paper its calculation procedure is generatedand the example of the building DP calculation isgiven.
机译:TAMU园区的冷水和热水泵上安装了越来越多的变频设备(VFD)。这些泵的速度可以变化,以将冷水或热水的差压(DP)或回水温度或流量保持在设定点。冷冻水和热水的DP设定点或返回温度设定点或流量设定点是恒定值或根据外部气温重新设定。在某些建筑物中,冷水和热水DP设定点是根据流量进行重置的,但是在许多情况下,这些设定点计划太低而无法维持足够的建筑物DPrequirement或过高且消耗了过多的能量。研究并与其他泵速控制方法进行了比较。由于通过跟踪负荷变化来实现基于流量法的建筑物DP设定点,因此比其他方法节省了能源。本文生成了其计算程序,并以建筑物DP计算为例。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号