首页> 外文OA文献 >Design and field construction of Hawkeye Bridge using ultra high performance concrete for accelerated bridge construction
【2h】

Design and field construction of Hawkeye Bridge using ultra high performance concrete for accelerated bridge construction

机译:用超高性能混凝土加速桥梁施工的鹰眼大桥设计与现场施工

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The Ultra High Performance Concrete (UHPC) consists of sand, cement, crushed quartz, silica fume, superplasticizer, water and steel fibers, with water-to cement (w/c) ratio of 0.24 or lower. By omitting coarse aggregates in the mix, density and mechanical homogeneity can be maximized. Also, adding steel fibers increases durability by producing exceptionally high compressive and tensile strengths. As a result, a bridge using UHPC can be designed slimmer and longer with less amount of steel reinforcements than a conventional concrete bridge. UHPC developed by Korea Institute of Civil Engineering and Building Technology (K-UHPC) was used to build a bridge, named “Hawkeye”, in Buchanan County, Iowa. This paper describes the design and construction process of the Hawkeye bridge which is the first bridge using K-UHPC in the United States. A unique pi-girder design, which is similar to the design previously developed at MIT, was adopted for the Hawkeye Bridge. The Hawkeye Bridge was successfully constructed using K-UHPC, utilizing local cement, sand and ready-mix trucks. Precast pi-girders were made at the Buchanan County, 17 miles (27 km) from the bridge site. A total of six girders were transported to the bridge site and installed in one day. This project not only demonstrated easy field constructability of K-UHPC but also set a great example of Accelerated Bridge Construction (ABC), which would minimize a traffic disruption.
机译:超高性能混凝土(UHPC)由砂,水泥,碎石英,二氧化硅烟雾,超塑料,水和钢纤维组成,水至水泥(W / C)比为0.24或更低。通过省略混合物中的粗聚集,可以最大化密度和机械均匀性。而且,添加钢纤维通过产生极高的压缩和拉伸强度来增加耐用性。结果,使用UHPC的桥梁可以更平滑并且与较少量的钢筋比传统的混凝土桥更少于传统的混凝土桥。由韩国土木工程和建筑技术(K-UHPC)开发的UHPC用于建造一座名为“Hawkeye”的桥梁,位于爱荷华州的布坎南县。本文介绍了Hawkeye桥的设计和施工过程,该桥是在美国使用K-UHPC的第一座桥梁。 Hawkeye Bridge采用独特的Pi-GiRder设计,类似于MIT先前开发的设计。 Hawkeye Bridge使用K-UHPC成功构建,利用当地水泥,沙子和准备混合卡车。预制PI-Girders是在布坎南县制造的,距桥田17英里(27公里)。共有六个梁被运送到桥接现场并安装在一天内。该项目不仅证明了K-UHPC的易于现场结构,还可以设置加速桥梁建设(ABC)的一个很好的例子,这将使交通中断最大限度地减少交通中断。

著录项

  • 作者

    Haena Kim;

  • 作者单位
  • 年度 -1
  • 总页数
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号