Contractors perspective of preferred risk allocation in public-private partnership (PPP) project in Pahang

机译:彭亨州公私合营项目中承包商对优先风险分配的看法

摘要

Public private partnership (PPP) procurement was introduced into Malaysia through the Ninth Malaysia Plan in March 2006. PPP capable to transfer risk away from public sector to private sector. Therefore, it is important for the public and private parties to understand the risks through the whole project lifecycle prior the risk allocation agreement is made. This study aims to identify the critical risk factors of PPP projects in Pahang and to examine the preferred risk allocations for PPP projects in Pahang. Data were collected by using a set of survey questionnaire among the contractors (one representative) in each company in Grade 7 of Construction Industry Development Board (CIDB) in Pahang. Results from the study indicated that top five risk factors in Pahang are: construction time delay”, “land acquisition”, “delay in project approvals and permits”, “design deficiency” and “inflation rate volatility”. Lastly, on risk allocation preferences, this study indicated that 7 risks out of 46 risks would be preferably allocated to the public sector while 25 risks could be assigned to private sector. 11 risks were preferred to be shared by both public and private parties and the remaining of 3 risks depended on project circumstances. The results provided sufficient insight and understanding into the process of PPP as well as look deeply into the critical risks associate in the PPP projects and the contractors’ preferred risk allocation for ensuring success of PPP projects
机译:通过2006年3月的第九个马来西亚计划,马来西亚引入了公私合营(PPP)采购。PPP能够将风险从公共部门转移到私人部门。因此,在制定风险分配协议之前,公共和私人各方在整个项目生命周期中了解风险非常重要。本研究旨在确定彭亨州PPP项目的关键风险因素,并研究彭亨州PPP项目的首选风险分配。彭亨州建筑业发展委员会(CIDB)七年级的每家公司的承包商(一名代表)使用一组调查问卷收集了数据。研究结果表明,彭亨州的五个主要风险因素是:施工时间延迟,土地征用,项目批准和许可的延迟,设计缺陷和通货膨胀率波动。最后,关于风险分配偏好,该研究表明,最好将46种风险中的7种风险分配给公共部门,而将25种风险分配给私营部门。最好由公共​​和私人双方共同承担11种风险,其余3种风险取决于项目情况。结果为PPP过程提供了足够的洞见和理解,并深入了解了PPP项目中的关键风险以及承包商为确保PPP项目成功而偏好的风险分配

著录项

  • 作者

    Kwai Loon Tan;

  • 作者单位
  • 年度 2014
  • 总页数
  • 原文格式 PDF
  • 正文语种
  • 中图分类