首页> 外文OA文献 >Improving Integrated Practice through Building Information Modeling-Integrated Project Delivery (BIM-IPD) for Malaysian Industrialised Building System (IBS) Construction Projects
【2h】

Improving Integrated Practice through Building Information Modeling-Integrated Project Delivery (BIM-IPD) for Malaysian Industrialised Building System (IBS) Construction Projects

机译:通过建筑信息模型-马来西亚工业建筑系统(IBS)建设项目的综合项目交付(BIM-IPD)改善综合实践

摘要

Current studies shows that most of the Industrialised Building System (IBS) project procurement or deliveryudmethods in Malaysia are still based on the traditional approach. This traditional construction process has beenudwidely criticized for its fragmented approach to project delivery and its failure to form effective teams. Due toudthat problem, a number of issues have recently arisen in current construction methods, such as reworks, timeuddelay, rising costs, lack of communication and coordination, and wastages. This paper through literature review aims to explore this fragmentation issue thus effects to the Malaysian IBS construction projects especially during the design and construction stages. Suggestion on how an integrated approach such as BuildingudInformation Modelling (BIM) and Integrated Project Delivery (IPD) can contribute for design and constructionudprocess in order to minimise the fragmentation issue will be concluded.
机译:当前的研究表明,马来西亚大多数工业建筑系统(IBS)项目的采购或交付 udmethods仍基于传统方法。这种传统的施工过程因其分散的项目交付方式和未能组建有效的团队而受到广泛的批评。由于该问题,最近的当前施工方法中出现了许多问题,例如返工,时间延迟,成本上升,缺乏沟通和协调以及浪费。本文通过文献综述的目的是探讨这种分散问题,从而对马来西亚IBS建设项目产生影响,尤其是在设计和施工阶段。关于如何将诸如建筑 udInformation Modeling(BIM)和集成项目交付(IPD)之类的集成方法如何有助于设计和施工 udprocess以最小化碎片问题的建议,将得出结论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号