首页>
外文OA文献
>DISCUSSION. TRAINING WORKS CONSTRUCTED IN THE RUPNARAIN RIVER IN BENGAL AFTER MODEL EXPERIMENTS TO PREVENT FURTHER BANK EROSION ENDANGERING THE BENGAL-NAGPUR RAILWAY LINE LINKING CALCUTTA WITH BOMBAY AND MADRAS. MARITIME WATERWAYS ENGINEERING DIVISION
【2h】
DISCUSSION. TRAINING WORKS CONSTRUCTED IN THE RUPNARAIN RIVER IN BENGAL AFTER MODEL EXPERIMENTS TO PREVENT FURTHER BANK EROSION ENDANGERING THE BENGAL-NAGPUR RAILWAY LINE LINKING CALCUTTA WITH BOMBAY AND MADRAS. MARITIME WATERWAYS ENGINEERING DIVISION