首页> 外文OA文献 >Study on Identifying Significant Risk Sources during Bridge Construction Based on Grey Entropy Correlation Analysis Method
【2h】

Study on Identifying Significant Risk Sources during Bridge Construction Based on Grey Entropy Correlation Analysis Method

机译:基于灰色熵相关分析方法的桥梁施工中识别显着风险源的研究

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Nowadays, many methods have been used in the identification of bridge risk sources, and certain results have been achieved. However, the research on the identification of significant risk sources of bridges during the construction period is relatively weak, and these methods still have some defects, such as the correlation between risk sources is not considered comprehensively, the dynamic risk sources are not fully considered, and the weight assignment is highly subjective. In order to solve these problems, this paper comprehensively uses the combination of expert scoring method, fuzzy analytic hierarchy process (F-AHP), and grey entropy correlation analysis (GECA) to identify significant risk sources during bridge construction. Firstly, the F-AHP and expert scoring method are used to initially identify safety sources during the bridge construction period, which effectively considers the identification of dynamic risk sources. Secondly, the combination of the GRA method and EW method is applied to identify the significant risk sources during bridge construction period, which can effectively analyze the interrelationship between different factors and greatly reduce the interference of subjective factors in the weight assignment, so as to effectively control the risks in construction and protect the health of the bridge structure and property losses. Finally, the feasibility and rationality of the proposed method were verified by comparing the AHP and GECA proposed in this paper in combination with specific engineering examples, which provides a reference basis for the identification of significant risk sources during the follow-up bridge construction period.
机译:如今,许多方法已经用于识别桥梁风险源,并且已经实现了某些结果。然而,在施工期间识别桥梁重大风险源的研究相对较弱,这些方法仍然存在一些缺陷,例如风险源之间的相关性不受全面考虑,动态风险源不完全考虑,重量分配是非常主观的。为了解决这些问题,本文全面地使用专家评分方法,模糊分析层次结构(F-AHP)和灰色熵相关分析(GECA)的组合来识别桥梁建设期间的重大风险源。首先,F-AHP和专家评分方法用于在桥梁施工期间最初识别安全源,从而有效地考虑了动态风险源的识别。其次,将GRA方法和EW方法的组合应用于桥梁施工期间识别显着的风险源,这可以有效地分析不同因素之间的相互关系,大大减少重量分配中主观因素的干扰,从而有效地减少主观因素的干扰控制施工的风险,保护桥梁结构的健康和财产损失。最后,通过将本文提出的AHP和GECA与特定工程实施例的组合进行比较来验证所提出的方法的可行性和合理性,为在后续桥梁施工期间提供了识别显着风险来源的参考依据。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号