首页> 外文OA文献 >Estimating the post-closure management time for landfills containing treated MSW residues.
【2h】

Estimating the post-closure management time for landfills containing treated MSW residues.

机译:估算包含处理过的城市固体废弃物的垃圾掩埋场的关闭后管理时间。

摘要

The Landfill Directive will require the pre-treatment of MSW prior to landfilling.The removal of progressively increasing proportions of the biodegradable fractions fromlandfilled waste, and the UK Government’s commitment to increase recycling of key wastefractions, will lead to an inevitable change, from the disposal of raw MSW, to the disposal ofMSW treatment residues, to landfill. This will undoubtedly change the type and rate ofemissions from landfills. The question that this research project has sought to answer is “howlong will active management be required for different MSW treatment residues?” The termequilibrium status has been used to define the end point beyond which management of wastes isno longer necessary. Calculating the equilibrium status of waste involves an assessment of thelandfill gas emissions, leachate quality and hydraulic status of the landfill. These key parameterschange with time as the landfill evolves. Equally, the engineering performance of a site is alsochanging with the gradual degradation of the liner and capping systems. The question posedabove is therefore not easily answered.
机译:《垃圾填埋指令》要求在填埋之前对城市固体废弃物进行预处理,从垃圾填埋场中逐渐增加比例的可生物降解部分中去除,以及英国政府承诺增加关键废物的回收利用,这将导致不可避免的改变的原始城市固体废弃物,到城市固体废弃物处理残留物的处置,再到垃圾填埋场。无疑,这将改变垃圾填埋场的排放类型和排放率。该研究项目试图回答的问题是“不同的MSW处理残留物需要多长时间进行主动管理?”术语平衡状态已用于定义不再需要废物管理的终点。计算废物的平衡状态需要评估垃圾填埋场的气体排放,渗滤液质量和垃圾填埋场的水力状况。随着垃圾填埋场的发展,这些关键参数随时间而变化。同样,随着衬管和封盖系统的逐渐退化,站点的工程性能也在变化。因此,上面提出的问题不容易回答。

著录项

相似文献

  • 外文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号