首页> 美国政府科技报告 >Franconia-Springfield Route, Section H001, Supplementary Subsurface Investigation
【24h】

Franconia-Springfield Route, Section H001, Supplementary Subsurface Investigation

机译:Franconia-springfield Route,H001,supplementary subsurface Investigation

获取原文

摘要

Results are presented herein of 54 borings made at various locations in SectionH001, Franconia-Springfield Route running parallel to the existing Richmond Fredericksburg and Potomac Railroad (RF&P) Trackage in the City of Alexandria, Virginia. Facilities investigated include: an earth dam across Long Branch, grading along the RF&P spur track, retaining walls along Metro trackage and around proposed facilities, six level parking structure, Greenleaf traction power substation, Tilbury Road traction power substation, and the North Mitigation Pond. The report contains geological sections through the borings, logs for the new test borings, results of laboratory tests on soil samples and comments on anticipated design and construction problems.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号