首页> 美国政府科技报告 >Optimal Path Planning for a Trolley Crane: Fast and Smooth Transfer of Load
【24h】

Optimal Path Planning for a Trolley Crane: Fast and Smooth Transfer of Load

机译:小车起重机的最佳路径规划:快速平稳的载荷传递

获取原文

摘要

Optimal speed references were designed for a trolley crane. The path planning problem was split into five phases: vertical upward movement of the load, acceleration of the trolley while still hoisting the load, horizontal movement of the trolley with maximum velocity without hoisting, deceleration of the trolley while setting down the load, and vertical downward movement of the load. Energy optimal speed references for a given transfer time were computed for the so-called diagonal movements in which the load and trolley moved simultaneously. A dynamical model of the crane mechanics and actuators was used in the formulated optimal control problem. The transfer times for the diagonal movements were made as small as possible so that the given maximal angular velocities of the actuators were not exceeded. Speed references for the three other phases were obtained easily since they involved either hoisting only or transfer of the trolley with constant velocity without hoisting. A pilot crane experiment showed that for a typical load transfer task the duration of the optimal movement was less than 50% of the duration of manual transfer. Moreover, the transfer of the load was smoother than in the manual operation and without any significant back and forth swinging of the load.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号