首页> 美国政府科技报告 >Interior Gas Distribution Technology for Tall Buildings. Phase 2. Case Study No.1. Evaluation of As-Installed versus Enhanced Gas Distribution System Valley Lo Apartments. Topical Report, August 1994
【24h】

Interior Gas Distribution Technology for Tall Buildings. Phase 2. Case Study No.1. Evaluation of As-Installed versus Enhanced Gas Distribution System Valley Lo Apartments. Topical Report, August 1994

机译:高层建筑内部配气技术。阶段2.案例研究No.1。评估安装与增强气体分配系统Valley Lo公寓。专题报告,1994年8月

获取原文

摘要

As Part of the research focusing on gas distribution issues within tall buildingsand addressing the technical and economic barriers to increasing the use of natural gas, this case study of an apartment building system analyzes a prototypical distribution concept representative of gas applications for most tall buildings. The concept includes a horizontal header, vertical riser, submeter stations, and horizontal piping network. Among other significant results of the study, it has shown that increasing the operating pressure of the distribution system, thus allowing the use of small diameter copper and corrugated stainless steel tubing, provides both a substantial increase in total gas delivery capacity and the ability to add future load. Appendixes include a description of the corrugated stainless steel tubing system and estimated costs of material and labor for the as-installed and enhanced piping systems.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号