首页> 美国政府科技报告 >Rock Mechanics Study of Shaft Stability and Pillar Mining, Homestake Mine, Lead,SD. (In Three Parts). 2. Mine Measurements and Confirmation of Premining Results
【24h】

Rock Mechanics Study of Shaft Stability and Pillar Mining, Homestake Mine, Lead,SD. (In Three Parts). 2. Mine Measurements and Confirmation of Premining Results

机译:轴稳定性和柱采矿的岩石力学研究,Homestake mine,Lead,sD。 (三部分)。 2.矿山测量和预测结果的确认

获取原文

摘要

A U.S. Bureau of Mines case study of pillar recovery in high-grade ore near theRoss shaft at the Homestake Mine, Lead, SD, has demonstrated the usefulness of the finite-element method for evaluating shaft pillar mining plans and shaft stability. This report focuses on mine measurements and calibration of the two-dimensional computer model and is the second in a series of three Reports of Investigations describing the Ross shaft study. In this study, borehole extensometers and other instruments were installed to provide data for model verification and to monitor the shaft. Results of the recalibrated two-dimensional model (UTAH2) confirmed the premining stability evaluation.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号