首页> 美国政府科技报告 >Consideration of the 15 Factors in the Metropolitan Planning Process: A Synthesisof Highway Practice
【24h】

Consideration of the 15 Factors in the Metropolitan Planning Process: A Synthesisof Highway Practice

机译:对都市规划过程中15个因素的思考:公路实践的综合

获取原文

摘要

This synthesis will be of immediate interest to land use and transportationplanning officials, with special interest to state, regional, and local planners and administrators who must respond to the requirements of the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA). The process for incorporating the 15 factors into the comprehensive land use and transportation plans by Metropolitan Planning Organizations (MPOs) and 23 factors into statewide plans by state planning agencies is described in this synthesis. Because the planning process is in a constant state of flux and many deadlines have been shifted, this report of the Transportation Research Board represents practice during mid 1994, and includes several case study examples of MPO approaches to addressing the 15 factors in their region. This synthesis provides information on how some agencies have succeeded in incorporating the 15 factors in their region. This synthesis provides information on how some agencies have succeeded in incorporating the 15 factors in the early stages of ISTEA implementation; however , it is not intended to be a guideline. Specific issues and concerns, both now and in the future, are highlighted, as are the elements that need to be considered throughout the complex process of responding to ISTEA and the 1990 Clean Air Act Amendments (CAAA) requirements.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号