首页> 美国政府科技报告 >Buffalo Bill Dam Spillway Intake Structure, Slab Analysis
【24h】

Buffalo Bill Dam Spillway Intake Structure, Slab Analysis

机译:布法罗比尔大坝溢洪道进水口结构,板坯分析

获取原文

摘要

When examining the spillway intake structure at Buffalo Bill Dam during theContinuous Facility Review (CFR) site exam (1), the slab downstream from the gate control structure was found to be covered with an asphalt paving. This paving, which extends beyond the area of the spillway slabs, is provided as a parking area for the nearby visitors center. The weight of the asphalt paving in itself poses no problems to the intake structure, but the unrestricted access that the paving provides to the spillway slabs makes it possible for very large vehicles (buses, trucks, mobile cranes, etc.) to travel across or park on top of the deck. Heavy vehicle loads could possibly exceed the structural capacity of the deck and supporting beams.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号