Removal and Replacement of Cast-in-Place Post-Tensioned Box-Girder Bridge.

机译:拆除和更换现浇后张拉箱梁桥。

获取原文

摘要

This report describes the analytical investigation of the removal and replacement of cast-in-place, post-tensioned, box-girder bridge decks. In order to extend the life of the overall bridge, the deck typically must be replaced. This is problematic in a post-tensioned bridge where the deck is part of the structural system that resists the prestress force. This analytical investigation examines the impact of deck removal and replacement. As bridges deteriorate due to environmental effects, this deterioration is more severe in the decks. Four specific bridges were chosen for analysis. These bridges were two simple span bridges (non-skewed and skewed), a two-span continuous bridge, and a three-span continuous bridge. The investigation was performed on bridges that might be considered for deck replacement in the future. A 3D finite element analysis was performed on all bridges and compared with a 2D analysis. Processes and recommendations for deck removal were given for simple and continuous span bridges. The impact in the amount of skew was also investigated in this topic. Recommendations were also given for traffic analysis and future design considerations for simple and continuous span bridges.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号