首页> 美国政府科技报告 >Phosphorus Control Action Plan and Total Maximum Daily (Annual Phosphorus) Load Report: Webber Pond, Kennebec County, Maine. Webber Pond PCAP-TMDL Report, Maine DEPLW 2002-0556.
【24h】

Phosphorus Control Action Plan and Total Maximum Daily (Annual Phosphorus) Load Report: Webber Pond, Kennebec County, Maine. Webber Pond PCAP-TMDL Report, Maine DEPLW 2002-0556.

机译:磷控制行动计划和每日总磷(年磷)负荷报告:缅因州肯纳贝克县韦伯池。 Webber pond pCap-TmDL报告,缅因州DEpLW 2002-0556。

获取原文

摘要

The objectives of this project were twofold: First, a comprehensive land use inventory was undertaken to assist Maine DEP in developing a Phosphorus Control Action Plan (PCAP) and a Total Maximum Daily Load (TMDL) report for the Webber Pond watershed. Simply stated, a TMDL is the total amount of phosphorus that a lake can receive without harming water quality. Maine DEP, with the assistance of the MACD Project Team, will address and incorporate public comments before final submission to the US EPA. Secondly, watershed survey work, including a shoreline and septic survey evaluation, were conducted by the Maine DEP-MACD project team to help assess total phosphorus reduction techniques that would be beneficial for the Webber Pond watershed. Watershed survey work included assessing direct drainage nonpoint source (NPS) pollution sites that were not identified during the Webber Pond Watershed Nonpoint Source Pollution Survey previously conducted in 1997. The China Region Lakes Alliance (CRLA) as part of its Watershed Management Plan (1998-2008) intends to conduct a comprehensive follow-up watershed survey. The results of this 1997 assessment report includes recommendations for future conservation work in the watershed to help citizens, organizations, and agencies restore and protect Webber Pond.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号