首页> 美国政府科技报告 >Finding of No Significant Impact and Programmatic Environmental Assessment for Implementing Fish Habitat Improvement Measures in Four Mountain Snake Province Subbasins under Action 149 of the December 2000 Fish Habitat Improvement Measures in Four Mountain Snake Province Subbasins, Idaho
【24h】

Finding of No Significant Impact and Programmatic Environmental Assessment for Implementing Fish Habitat Improvement Measures in Four Mountain Snake Province Subbasins under Action 149 of the December 2000 Fish Habitat Improvement Measures in Four Mountain Snake Province Subbasins, Idaho

机译:根据2000年12月在爱达荷州四山蛇岛流域改善鱼类栖息地改善措施的行动149,在四个山蛇省流域实施鱼类栖息地改善措施没有产生重大影响和计划性环境评估

获取原文

摘要

The National Marine Fisheries Service (NMFS) issued the Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) on December 21, 2000. NMFS concluded that the continued operations of the FCRPS would constitute jeopardy under the Endangered Species Act (ESA) for 8 of the 12 listed Evolutionarily Significant Units (ESUs) of salmon and steelhead, unless their Reasonable and Prudent Alternative (RPA) was implemented. The RPA included 199 actions that must be implemented by Federal agencies, including Reclamation, to avoid a jeopardy decision. Action 149 required Reclamation to do habitat improvements as off-site mitigation for the effects of the main stem Columbia River dams. Habitat improvements implemented under Action 149 are expected to result in overall, long-term benefits to ESA-listed and other anadromous and resident fish. Implementation of Action 149 is a Federal action and Reclamation is required to follow procedures of the National Environmental Policy Act (NEPA). To comply with NEPA, Reclamation has prepared a Programmatic Environmental Assessment (PEA) which addresses the potential impacts associated with fish habitat improvement measures in four of the 15 subbasins considered in Action 149: the Lemhi, Upper Salmon, Middle Fork Clearwater, and Little Salmon Subbasins. Habitat improvement measures will take place on private lands with willing participants. Because the specific locations and numbers of participants are not known, and the choice of specific measures cannot be determined at this time, the EA was prepared at a programmatic level. The PEA addressed the broad range of implementation measures proposed to comply with Action 149.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号