首页> 美国政府科技报告 >Liquefaction Mitigation using Vertical Composite Drains: Full-Scale Testing for Pile Applications. Highway IDEA Program
【24h】

Liquefaction Mitigation using Vertical Composite Drains: Full-Scale Testing for Pile Applications. Highway IDEA Program

机译:使用垂直复合排水的液化减缓:桩应用的全尺寸测试。高速公路IDEa计划

获取原文

摘要

This follow-on activity to a previous NCHRP-IDEA project (NCHRP-94) involved full-scale field tests to evaluate the liquefaction mitigating effect of vertical composite drains for pile applications. Work in the first phase focused on site characterization and blast testing in an untreated area. A pattern of small explosive charges was established for detonation to simulate the liquefaction process produced by an earthquake, and pilot tests were performed with various charge weights and delays to better simulate the duration and intensity of an earthquake and to determine the energy required to induce liquefaction. The field tests were performed at a site near Vancouver, British Columbia. The tests also included pile load testing before and after blast testing in areas treated and untreated with drains. The field test results were complemented with modeling analysis to determine likely pore pressure response in the area treated with drains. The test results and modeling analysis verified the effectiveness of the proposed approach.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号