Nuclear Waste: Plans for Addressing Most Buried Transuranic Wastes Are Not Final, and Preliminary Cost Estimates Will Likely Increase

机译:核废料:处理大多数埋藏的超铀废物的计划不是最终的,初步成本估算可能会增加

获取原文

摘要

Since the 1940s, the development of nuclear weapons technologies has generated transuranic wastes-materials contaminated by certain man-made radioactive elements. These wastes can remain dangerous for thousands of years. Until 1970, the Department of Energy's (DOE) predecessors buried these wastes in shallow pits and trenches. Today, state officials and communities near DOE's major disposal sites have expressed concerns that such wastes might contaminate important ground and surface water resources. GAO was asked to (1) determine the legal requirements and policies affecting DOE's efforts to address transuranic wastes buried before 1970, (2) determine what DOE is doing to address sites where these transuranic wastes are buried, and (3) assess the reliability of DOE's estimated costs to address these sites. We met with federal and state officials at five DOE sites containing buried transuranic wastes, reviewed environmental laws and guidance, and obtained buried waste cleanup cost estimates from each site.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号