首页> 美国政府科技报告 >Assessment of Dam Safety Coal Combustion Surface Impoundments (Task 3) Final Report, Louisville Gas and Electric Company (a Subsidiary of E.ON U.S.), Cane Run Power Station, Louisville, Kentucky
【24h】

Assessment of Dam Safety Coal Combustion Surface Impoundments (Task 3) Final Report, Louisville Gas and Electric Company (a Subsidiary of E.ON U.S.), Cane Run Power Station, Louisville, Kentucky

机译:大坝安全煤燃烧表面蓄水评估(任务3)最终报告,路易斯维尔天然气和电力公司(美国E.ON的子公司),Cane Run电站,路易斯维尔,肯塔基州

获取原文

摘要

CHA was contracted by Lockheed Martin (a contractor to the United States Environmental Protection Agency (EPA)) to perform independent engineering reviews of selected coal combustion surface impoundment inspection reports (Project 0-381 Coal Combustion Surface Impoundments/Dam Safety Inspections Task 3). As part of this contract, CHA was assigned to perform a site assessment of Louisville Gas & Electric Companys (a subsidiary of E.ON U.S.) coal combustion waste (CCW) impoundments at the Cane Run Station, which is located in Louisville, Jefferson County, Kentucky as shown on Figure 1 Project Location Map. CHA made a site visit on October 28, 2009 to inventory CCW surface impoundments at the Cane Run facility, to perform visual observations of the containment dikes, and to collect relevant information regarding the site assessment.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号