首页> 美国政府科技报告 >Rehabilitation of Eklutna Project Features Following 1964 Earthquake: A Supplement to Eklutna Dam, Tunnel and Powerplant (Constructed 1951-1955; Rehabilitated 1964-1965) Eklutna Project, Alaska. Technical Record of Design and Construction. A Water Resources Technical Publication
【24h】

Rehabilitation of Eklutna Project Features Following 1964 Earthquake: A Supplement to Eklutna Dam, Tunnel and Powerplant (Constructed 1951-1955; Rehabilitated 1964-1965) Eklutna Project, Alaska. Technical Record of Design and Construction. A Water Resources Technical Publication

机译:1964年地震后Eklutna项目特征的修复:Eklutna大坝,隧道和动力装置的补充(建于1951年至1955年; 1964年至1965年修复)阿拉斯加Eklutna项目。设计与施工技术记录。水资源技术出版物

获取原文

摘要

This supplement to the technical record of design and construction for Eklutna Dam, Tunnel and Powerplant discusses the rehabilitation of the Eklutna project features following the severe Alaska earthquake of March 27, 1964. The supplement is divided into three parts. Part I is devoted to brief descriptions of the features as originally designed and as later rehabilitated, a brief account of the inspections and assessment of the earthquake damage, a summary of rehabilitation costs, and geology particularly in relation to the earthquake. Part II contains two chapters on design, one dealing with the replacement of the intake structure and the repair of the conduit, and the other discussing the new dam and spillway. Part III contains three chapters related to construction, one on contract administration, one on emergency work to restore and maintain power generation immediately following the earthquake, and one on major repairs to the intake conduit and replacement of the dam, spillway, and intake structure.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号