首页> 美国政府科技报告 >Analytical Problems in Modeling Slurry Wall Construction.
【24h】

Analytical Problems in Modeling Slurry Wall Construction.

机译:泥浆墙施工建模中的解析问题。

获取原文

摘要

Three aspects of slurry wall construction are considered. These are the alteration of the initial stress state in the soil adjacent to the wall by the trench excavation and support process,the further alteration of the initial stress condition for a cast-in-place wall by placement of the high density concrete slurry and subsequent shrinkage of the slurry upon set-up,and the modification of the soil structure interface due to the impregnation of slurry upon set-up,and the modification of the soil adjacent to the wall and the formation of a slurry cake between the soil and the wall. Analytical methods,including finite element analysis and associated fields,for modeling slurry wall construction are reviewed and evaluated.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号