首页> 美国政府科技报告 >Well Control in Case of Offshore Blowout: Combined Casing and Tubing Shut-In Devices, BOS and Use of Shear Rams on Completed Wells
【24h】

Well Control in Case of Offshore Blowout: Combined Casing and Tubing Shut-In Devices, BOS and Use of Shear Rams on Completed Wells

机译:海上井喷情况下的井控:组合套管和油管关闭装置,BOs以及完井上剪切公羊的使用

获取原文

摘要

Only two methods which can shut in annulus and tubing to prevent or stop blowout quickly have been identified: (1) A shear ram BOP on top of the casing hanger around an extended prod. casing and below the tubing head. (2) BOS, a crimper placed in an expanded annulus outside special crimping joints of production casing and tubing. BOS competes with a separate annulus shut-in valve combined with tubing retrievable DHSV. Both BOP shear ram and BOS are recommended for further study.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号