首页> 美国政府科技报告 >Conventional Design and Construction Methods Are More Applicable for Capitol Hill Construction Projects
【24h】

Conventional Design and Construction Methods Are More Applicable for Capitol Hill Construction Projects

机译:传统的设计和施工方法更适用于国会山建设项目

获取原文

摘要

Attempts by the Architect of the Capitol to use a phased construction method, under which construction is begun on some segments of a project while others are still being designed, have contributed to cost overruns, completion delays, and management problems on congressional building projects. GAO's reviews of recent projects show that phased construction does not work well for Capitol Hill construction projects due to the numerous reviews and approvals required at each phase, funding problems, complexity of design and quality of construction required on monumental buildings, and likelihood of numerous design changes. The Architect might be able to minimize or alleviate some of these problems by trying more conventional design and construction methods. GAO recommends other actions the Architect should take to improve the management of construction activities before undertaking the planned restoration of two Library of Congress buildings.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号