首页> 美国政府科技报告 >Integrated Operation of Ferric Chloride Leaching, Molten-Salt Electrolysis Process for Production of Lead
【24h】

Integrated Operation of Ferric Chloride Leaching, Molten-Salt Electrolysis Process for Production of Lead

机译:氯化铁浸出,熔盐电解法生产铅的综合操作

获取原文

摘要

The Bureau of Mines, under a cooperative research program with four lead companies, has investigated a nonsmelting process for the production of lead metal. The process, which would eliminate sulfur dioxide generation and minimize particulate lead emissions, involves ferric chloride leaching of galena concentrate to produce lead chloride, followed by molten-salt electrolysis of the lead chloride to yield lead metal and chlorine. This chlorine is used to regenerate ferric chloride in the leaching solution. The process has potential for producing lead with minimum pollution, but is not ready for commercial utilization. Operation of a prototype commercial electrolytic cell and a full-scale pilot-plant investigation by industry are needed to evaluate the commercial viability of the process.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号