首页> 美国政府科技报告 >Construction Quality Control and Post-Construction Performance Verification for the Gilson Road Hazardous Waste Site Cutoff Wall
【24h】

Construction Quality Control and Post-Construction Performance Verification for the Gilson Road Hazardous Waste Site Cutoff Wall

机译:Gilson Road危险废物场地防渗墙施工质量控制及施工后性能验证

获取原文

摘要

The report describes assessment activities undertaken to evaluate the effectiveness of a soil/bentonite backfilled cutoff wall (slurry trench) installed for the purpose of hazardous waste containment. The work includes development and evaluation of field quality control tests, evaluation of electronic piezocone instrumentation for post-construction verification of backfill homogeneity, and evaluation of cutoff wall bulk hydraulic conductivity via hydraulic stress testing. The information in the report is useful to those involved in the feasibility study, design and/or construction of cutoff walls as a hazardous waste remediation technology.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号